Power Solutions DFA

Case studies · Protection

1,100 operations in 33 minutes, from reclosers that never locked out

Twelve episodes on ten reclosers at six utilities. None of the utilities knew, and no customer complained.

Where
Six utilities, from small cooperatives to a large investor-owned utility
Scope
10 reclosers at 6 utilities
Worst case
About 1,100 operations in 33 minutes
Customer complaints
None
Who knew
Nobody, until DFA
1

What DFA reported

A line recloser set to lock out after a few trips should never reclose dozens of times. DFA has documented twelve episodes in which hydraulic reclosers did exactly that. In the worst, a recloser on a 25 kV circuit operated about 1,100 times in 33 minutes. Another pumped 740 times, then six months later about 320 times in 22 minutes, 13 of them in a single minute.

2

What the crew found

Each utility was unaware, and none of those contacted had received a single customer complaint. DFA recorded every operation from the substation, with the phase and the current.

✓

Why it matters

Every reclose into a fault is another ignition chance, another interruption for customers beyond the recloser, and more damage at the fault and inside the recloser. One recloser did it twice, six months apart.

Sources. CIGRE US National Committee Grid of the Future Symposium, Kansas City, 2023. International Conference on Developments in Power System Protection (DPSP), Manchester, 2024. IEEE PES ISGT Europe, 2024.