Six faults in nine hours, no outage, no calls, and a branch removed

A hanging branch tripped a recloser six times without an outage. DFA grouped the faults into one report, and a targeted patrol found it.

Utility
Pedernales Electric Cooperative
DFA reported
Recurrent fault, phase C to ground, about 300 A
Circuit
12.5 kV, 153 miles of primary, 1,008 meters
Found
A branch hanging on a remote single-phase tap
Outcome
Removed with no outage and minimal conductor damage
1

What DFA reported

During a storm, a detached branch hanging on a remote single-phase tap caused six faults over nine hours. A hydraulic recloser cleared each one with a trip and a reclose. Nobody lost power and nobody called, so ordinarily the co-op would have done nothing. DFA grouped the six faults into one recurrent-fault report: phase C to ground, about 300 A, behind a single-phase recloser.

2

What the crew found

At 300 A the circuit model alone listed many possible locations. The co-op used DFA's details to rule out some of the circuit's reclosers, confirmed the operating one with meter blink counts, and sent a targeted patrol that found and removed the branch.

✓

Why it matters

The co-op calls it an averted fire hazard, found with minimal crew time. It also corrected the phasing on its map.

“In one case, we were able to pinpoint the location of a branch on an overhead line that could have become an ignition source for wildfire in a rural subdivision.”Robert Peterson, director of control center and emergency preparedness, Pedernales Electric Cooperative (2018)
Sources. R. A. Peterson (Pedernales Electric Cooperative), C. L. Benner, B. D. Russell, "Fault Anticipation Improves Operations," T&D World, June 2018. IEEE Rural Electric Power Conference, Columbus, 2017.