Power Solutions DFA

Case studies · Recurrent faults

Two storm trips three weeks apart, one cause, fixed by trimming

DFA gave the utility its only notice that two breaker operations were the same fault, and what it was.

Where
Overhead circuit, United States
DFA reported
The same fault twice, three weeks apart
Cause
Branches pushing the phases together
Found
Conductor already showing broken strands
Outcome
Targeted trimming stopped the repeats
1

What DFA reported

Two momentary operations of the substation breaker happened during storms three weeks apart. DFA gave the utility its only notice that both were the same fault, and information to locate the cause: branches pushing the phases together.

2

What the crew found

The crew found the spot. The conductor already showed broken strands from repeated contact.

✓

Why it matters

Targeted trimming stopped the momentary operations before they became lockouts, line damage or a burn-down, and the work was done in fair weather.

Sources. Texas A&M University, DFA presentations, 2018-2019.